Project Links: Project Home Vicinity Map Newsletter Presentation Boards Project Videos Draft Project Report Storm Water Data Report Draft EIR Agreement Template RFP New Disadvantage Business Enterprise Requirements Advisory Fact Sheet Aerially Deposited Lead Assessment Mandatory Fact Sheet Ramp Meter Policy Fact Sheet |
Watt Avenue @ US 50 Interchange Project Description This project proposes to provide multi-modal
improvements along one of the region's most critical transportation corridors, Watt Avenue. The segment of Watt Avenue between Kiefer Boulevard and Fair Oaks Boulevard includes a key link to the U.S. Highway 50 corridor and is adjacent to one of the few available crossings of the American River. Improvements proposed are based on the findings of the South Watt Area Transportation Study (SWATS), which developed a multi-modal transportation master plan for the southern Watt Avenue corridor.
The project is being closely coordinated with the Light Rail Transit Grade Separation Project over Folsom Blvd and with Sacramento Regional Transit's vision of BRT on Watt Avenue. Schedule
Preliminary Study, 2002 to 2008 Funding Partial funding has been approved for the project planning activities through construction from the following funding sources:
We are anticipating additional funding from Federal and State sources to help finance the construction of this project. The estimated total project cost including all phases of work is $52.5 million. Contact Information For additional information or to provide a comment about the project: |
||
|
|
|||
|
|||