Jump to Page Content
www.sacdot.com Where the Commitment to Excellence is Standard Practice Municipal Services Agency, Department of Transportation County of Sacramento
Municipal Services Agency www.sacdot.com Where the Commitment to Excellence is Standard Practice County Home Services Help County Home
  Home   |   Documents   |   Services   |   Projects-Programs   |   About   |   Sitemap     
 
Project Links:

Project Home

Vicinity Map

Newsletter

Presentation Boards

Project Videos

Draft Project Report

Storm Water Data Report

Draft EIR

Agreement Template

RFP

New Disadvantage Business Enterprise Requirements

Advisory Fact Sheet

Aerially Deposited Lead Assessment

Mandatory Fact Sheet

Ramp Meter Policy Fact Sheet



Watt Avenue @ US 50 Interchange

Project Description

This project proposes to provide multi-modal improvements along one of the region's most critical transportation corridors, Watt Avenue. The segment of Watt Avenue between Kiefer Boulevard and Fair Oaks Boulevard includes a key link to the U.S. Highway 50 corridor and is adjacent to one of the few available crossings of the American River. Improvements proposed are based on the findings of the South Watt Area Transportation Study (SWATS), which developed a multi-modal transportation master plan for the southern Watt Avenue corridor.

The project proposes to modify the existing full "cloverleaf" interchange on US Route 50 (US-50) at Watt Avenue in order to reduce congestion, increase safety, and accommodate alternate modes of travel. Modifications will include the following:

  • removing two loop ramps to eliminate the short weaving sections in both the outer lanes of north bound and south bound Watt Avenue and in the ramp transitions along east bound and west bound US50;
  • installing two signalized intersections to allow left and right turns from US 50 onto Watt Avenue;
  • constructing a new center structure connecting the existing north bound and south bound overpasses;
  • installing the initial working segment of a dedicated Bus Rapid Transit (BRT) facility;
  • constructing two separated bicycle and pedestrian pathways along Watt Avenue through the interchange with undercrossings at the ramps;
  • constructing related intersection and transit access improvements

The project is being closely coordinated with the Light Rail Transit Grade Separation Project over Folsom Blvd and with Sacramento Regional Transit's vision of BRT on Watt Avenue.

Schedule

Preliminary Study, 2002 to 2008
Environmental Review, 2004 to 2009
Design, 2006 to 2010
Right-of-Way Acquisition, 2009 to 2010
Construction, 2011 to 2013

Funding

Partial funding has been approved for the project planning activities through construction from the following funding sources:

  • State Transportation Improvement Program (STIP),
  • Traffic Congestion Relief Program (TCRP),
  • Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) Regional Surface Transportation Program (RSTP),
  • SAFETEA-LU Federal Demonstration (Earmark) Funds,
  • Sacramento County Measure A Sales Tax, and
  • Other local transportation matching funds.

We are anticipating additional funding from Federal and State sources to help finance the construction of this project. The estimated total project cost including all phases of work is $52.5 million.

Contact Information

For additional information or to provide a comment about the project:

John Jaeger, Project Manager
Senior Civil Engineer
916-874-7507
jaegerj@saccounty.net