Bradshaw Road - Calvine to Florin Project Description This Bradshaw Road (Calvine to Florin) improvement project will provide a number of roadway system benefits including:
Planned roadway improvements include:
The project also includes the installation of a 48-inch water main along Bradshaw Road between Calvine Road and Florin Road. It is a key component of the SCWA master plan for the Zone 40 water supply system, as it will connect the future Vineyard Surface Water Treatment Plant to existing water transmission and distribution systems within Zone 40's central and south service areas. Schedule
Preliminary Engineering, 2003 Funding The total project construction cost is $16.43 million which includes $6.5 million for a Sacramento County Water Agency pipeline. The remaining $9.93 million for the Department of Transportation portion of the project is funded by Measure A Sales Tax funds. Contact Information Crystal Tu, Project Manager |
||
|
|
|||
|
|||